Project & Construction Management


Today’s highly competitive business environment places greater emphasis on maximizing the use of available resources. Planning, design and construction of facility improvements is an extremely complex process and a significant investment of those limited resources. As a result, professional management of a building program is essential for successful implementation. MRC has assembled specific professionals seasoned project managers with other business and technology skills who work well in a team environment. MRC’s project and Construction Management Division understand well the fundamental principles of, and the need for, co-ordination in the design and construction process, and therefore, is committed to providing cost effective management and technological solutions during project planning, design, construction and post construction period.

The multi-disciplinary Project & Construction Management team at MRC monitors,reviews and manages the building project within the defined time, quality and budget parameters.The team provides continuous supervision and control at the project site on uality of material and workmanship; and at the office for co-ordination between client, design consultants and contractors for implementation as per the design, specification and contract conditions. We provide co-ordination with specialised agencies like waste management, medical gas supply, lifts, kitchen equipment etc.; establish the MIS; analyse requests for change order; co-ordinate submission of statutary and required information from contractors / agencies.

The compehensive scope of our services covers all discplines at work site and include


Some projects in this area of specialisation are:

British Council Building, New Delhi
The new office building of British Council together with a library, an auditorium and
an art gallery.


Institute of Town Planners, New Delhi
A ten storeyed building with the main block supported on four columns with one storey high virendeel cantilevers expressed in the elevation.
LIC Jeewan Bharti, New Delhi
A commercial building consisting of two 13 storey towers springing out of a three level base comprising of two basements and a terraced piazza

National Institute of Fashion Technology,
New Delhi
The premier fashion technology institute is housed in this 7,000 sqm acaedemic and residental complex

Hughes Software Systems, Gurgaon
The complex on two acres has a built up area of about 10,000 sqm. Big halls and a large atrium are special features.

Hughes Software Systems, DLF Square, Gurgaon
As Project Managers for the software
facilities, the total design of the interiors,
the HVAC, electrical network and civil
finishes were completed in 39 days.

Craft Museum Complex, Pragati Maidan,
New Delhi

The complex of permanent exhibition areas, administration, library etc. is for the study and exhibition of folk and tribal arts, crafts and textiles.
J.N. Institute of Development Banking, Hyderabad
The residential Institute to train senior managers from banks has a layout to encourage discussions and interaction between the faculty and trainees.

 

 

© 2014 Mahendra Raj Consultants Pvt. Ltd.
Powered by SPIDEN SOLUTIONS

The snow is long gone, but Hemlock Street replica watches is still standing, available for use in other movies, TV shows and commercials. Even though it lacks structural foundation, "it was built to code," louis vuitton replica Stover says. "There's an infrastructure for electricity, for water, for drainage," noting how pleased the crew members were that their louis vuitton replica handiwork would remain intact. His own satisfaction comes from solving an enormous logistical problem. "What makes any given movie more louis vuitton replica interesting is how big of a challenge it seems and how you conquer the challenge," he says. "It was a great luxury to be able to design that street exactly how I wanted it to replica watches look." How Quartz Watches WorkThere was no problem with the choice of a timing element. The quartz crystal is possibly thousands of rolex replica times better for timing than the tuning fork, and quartz crystals had been around for many years. Only the type and the frequency of the crystal needed to be chosen. The difficulty was in the selection of the integrated circuit technology that would function rolex replica at sufficiently low power.